North of I-10, at the edge of the national forest
Asphalt Paving in Latimer, MS
Larger lots, longer drives and new homes on higher ground.
- Free on-site estimates
- Written, itemized quote with base and asphalt thickness listed
- MS811 locates requested before any digging or grading

Long Drives on Higher Ground
Asphalt paving in Latimer is mostly about long driveways on larger lots. Latimer is a census-designated place in western Jackson County, about 11 miles north of Biloxi. Interstate 10 forms its southern boundary, with access from Exit 50, and the northern half of the CDP lies within De Soto National Forest. Its listed elevation of 72 feet is well above the coastal communities to the south, so the ground is drier, but the drives are longer and many still start as gravel.
Gravel to asphalt
Converting a gravel drive is one of the most common jobs in Latimer. A gravel drive that has been driven on for years can make a good base, but only if it is thick enough and not mixed into the soil. We regrade it, add crushed stone where it has thinned, compact it and pave. Where the gravel has sunk into soft spots, we dig those out first. The result is a drive that does not wash out, rut or throw stones.
Ditch crossings and culverts
Many Latimer properties reach the road over a roadside ditch, with a culvert pipe under the driveway. A pipe that is crushed, rusted through or too small sends water over the drive and the road in heavy rain. When we pave, we look at the crossing and can replace the pipe and rebuild the approach so the new asphalt is not undermined at the most important spot.
Fast growth
Latimer grew from 4,288 people in 2000 to 6,079 in 2010, a 41.8% increase, and 6,720 in 2020. Housing grew from 1,538 units to 2,609, with only 5.8% vacant in 2020. A lot of those homes were built in the last 25 years, and their driveways are now due for their first round of crack sealing and sealcoating, or for paving if they were left as gravel.
Long drives, smart budgets
A long drive is a big surface to pave. We can phase it, paving the section near the house first and extending it later, or pave a narrower width with gravel shoulders. We also look at whether a shorter route to the road makes sense. Each option comes with a written estimate so you can compare.
Turnarounds and parking pads
On a long drive, backing out to the road is a hassle and a hazard. Adding a turnaround or an extra parking pad near the house is one of the most useful upgrades we build in Latimer, and it is easiest to add when the drive is being paved.
County roads
Latimer is unincorporated, so local roads are Jackson County roads. The CDP borders D'Iberville to the west and St. Martin to the south. We confirm county requirements for your road before changing the driveway connection or the ditch crossing, and we call MS811 for utility locates at least two working days before digging.
Call (228) 400-7954 for a free estimate in Latimer. Get a free estimate
Latimer Facts
- Location. Latimer lies about 11 miles north of Biloxi; I-10 forms its southern boundary, with access from Exit 50.
- National forest. The northern half of the Latimer CDP lies within De Soto National Forest; its listed elevation is 72 feet.
- Growth. Latimer grew from 4,288 people in 2000 to 6,079 in 2010 (up 41.8%) and 6,720 in 2020.
- Housing. Housing units rose from 1,538 in 2000 to 2,609 in 2020, when 5.8% were vacant.

Our Services in Latimer, MS
Latimer Questions
Can you pave over my existing gravel?
Often, yes. If the gravel is thick and firm, we regrade it, add stone, compact it and pave. Soft spots are dug out and rebuilt first.
My culvert floods the driveway. Can you replace it?
Yes. We can replace the pipe and rebuild the approach when we pave, so water passes under the drive instead of over it.
How can I keep costs down on a long driveway?
Options include paving in phases, a narrower paved width with stone shoulders, or a shorter route. We price each option in writing.
Who handles the road connection in Latimer?
Latimer is unincorporated, so road connections fall under Jackson County. We confirm the requirements for your road.
When should a newer driveway be sealed?
After the asphalt has cured, usually several months to a year, and then every few years depending on sun and wear.
Can you add a turnaround to my driveway?
Yes. We build the base and pave the turnaround with the rest of the drive, or add it to an existing asphalt drive with a clean joint.
Asphalt Paving Near Latimer
- Asphalt Paving in Biloxi, MS
- Asphalt Paving in Gulfport, MS
- Asphalt Paving in D'Iberville, MS
- Asphalt Paving in Ocean Springs, MS
- Asphalt Paving in Gautier, MS
- Asphalt Paving in Long Beach, MS
- Asphalt Paving in Pascagoula, MS
- Asphalt Paving in Moss Point, MS
- Asphalt Paving in Pass Christian, MS
- Asphalt Paving in Diamondhead, MS
- Asphalt Paving in St. Martin, MS
- Asphalt Paving in Gulf Hills, MS
- Asphalt Paving in Gulf Park Estates, MS
- Asphalt Paving in Vancleave, MS
- Asphalt Paving in Saucier, MS
- Asphalt Paving in Lyman, MS
- Asphalt Paving in Escatawpa, MS
- Asphalt Paving in Helena, MS
- Asphalt Paving in DeLisle, MS
- Asphalt Paving in Kiln, MS
- Asphalt Paving in Bay St. Louis, MS